Izochem PU 50
Izochem PU 50
polyurethane fill
Horizontally
Horizontally
Pouring
Pouring
Bridges
Bridges
Road viaducts
Road viaducts
Trackways
Trackways

Usage:

  • in the track construction system: for flexible filling of gaps between the track and other materials in a road lane (granite cobblestone, asphalt, concrete)
  • in rail fastening systems and tramways as flexible support and fastening the rail
  • for making resilient grouts for grooved rails
  • for sealing rail heads
  • for flexible filling of expansion joints between concrete slabs, concrete slabs and steel elements and cut asphalt, exposed to dynamic vehicular and pedestrian traffic

Advantages:

  • excellent adhesion to asphalt, concrete and steel substrates
  • self-flowing, fills spaces well
  • highly flexible
  • dampens vibrations and reduces noise
  • provides protection against stray voltage
  • permanently resistant to dents above 3 mm in the edge of tram tracks
  • stable in compression, tension and shear
  • resistant to de-icing salt dissolved in water
  • frost resistant
  • odporna na działanie mrozu

Selected technical parameters:

  • shore hardness, scale A: 45 ± 5
  • peel strength –concrete substrate, pull-off: at least 2.0 MPa
  • for joint filling of ≤70 mm width

Consumption:

  • ca. 1.0 kg/dm3 of slit volume

Packaging:

  • 10 kg (set)

Specification:

  • PN-EN 14188-2

Download product card